PJM and Other Grid Operators File Large-Load Reforms at FERC: Fast Energization, Ride-Through Rules and a 50-MW Computational Load Class
PJM filed two large-load packages at FERC on Nov. 16: a one-year Fast Energization study process with new data center transmission services, and ride-through rules for a new 50-MW-and-up computational load class. MISO, CAISO, NYISO and ISO-NE filed their own plans.
Read the story →