AEP Raises Five-Year Capital Plan to $100 Billion as Contracted Load Reaches 84 GW, Led by SB Energy's 10.4-GW Piketon, Ohio, Campus
AEP lifted its 2026-2031 capital plan from $78B to $100B and says contracted large load rose to 84 GW, driven largely by a proposed 10.4-GW Piketon, Ohio campus that would be served by three new 765-kV lines budgeted at about $5B.
Read the story →