Crusoe Introduces Spark Liquid, a 3.5-MW Liquid-Cooled Modular Unit Built for NVIDIA GB300 and Vera Rubin Racks
Crusoe says its sixth-generation Spark module packs up to 3.5 MW of compute into a factory-built unit with closed-loop liquid cooling that uses no water. It is designed for NVIDIA GB300 NVL72 and Vera Rubin NVL72 racks, and production at the company's Brighton, Colorado, plant is set to start in 2027.
Read the story →